Airvana ipBTS C30 Installation and Commissioning, Release 4.0
B-1
Appendix B
Hot-swapping ipBTS hardware
This appendix describes how to replace a failed component in the field. The ipBTS contains
the following hot-swappable and Field Replaceable Units (FRUs):
•
RN shelf components:
•
Radio module
•
Fan Trays
•
Air filter
The ADCC module is also FRU but replacing the module causes a service disruption:
Specifically this appendix includes the following information:
•
•
•
•
•
Replacing a Radio module
Use this procedure to replace a radio module in an ipBTS C30 shelf.
Tools required
To replace a radio module you will need the following tools:
•
#2 phillips-head screwdriver
•
Torque wrench with appropriate N-connector attachment for RF cables
•
Torque wrench with appropriate SMA connector attachment for SMA cables
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...