RN commissioning
This chapter explains the steps required to commission the ipBTS C30. Specifically, it contains
the following sections:
•
•
•
Establishing a console connection
•
Connecting the laptop to the ipBTS C30
•
Downloading and activating new software
•
Downloading and activating new software
•
•
•
•
Configuring IP on the Ethernet port and laptop
•
Establishing the CLI/SSH/Ethernet connection
•
Requirements
The ipBTS C30 must be completely installed and powered up. Follow the procedures in
Chapter 3, ipBTS C30 installation
before proceeding with the steps in this chapter.
Hardware requirements
Commissioning requires the following hardware:
•
Laptop running Microsoft Windows 2000 or Windows XP.
•
An Ethernet network interface card (NIC) on the laptop.
The software is transferred to the ipBTS C30 over the Ethernet.
•
A cross-over ethernet cable with standard RJ-45 connectors.
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...