Chapter 4
l
RN commissioning
Establishing a console connection
Airvana ipBTS C30 Installation and Commissioning, Release 4.0
4-5
Configuration parameters
This section describes the configuration information you must have to commission the
ipBTS C30. To commission the ipBTS C30, you must know the following:
•
ipBTS C30’s node IP address
•
ipBTS C30’s Ethernet port IP address
•
Laptop’s Ethernet port IP address
Table 4-2.
Required software
Component
Function
Terminal emulation program, such as
HyperTerminal which comes standard
with Microsoft Windows
The terminal emulation program allows you to download and
upload software, as well as access the CLI (command line
interface).
An open-source client like WinSCP,
PuTTY, or PSFTP, or any other third
party application that supports these
protocols.
Required to connect to modules using SFTP and SSH
protocols.
Version of software that should be on
the ipBTS C30
Enables you to determine if the version of software currently
on the ipBTS C30 needs to be upgraded.
Note
: For more information, contact your network planner.
Commissioning script
Configures the ipBTS C30 with necessary attributes to
commission the device.
Note:
The configuration script is necessary only if you are
using a script to commission the device. In this guide, the
Commissioning script is referred to as <
script_filename
>.
For more information about the Commissioning script,
contact your network planner.
ipBTS C30 software release
Enables you to download the most recent version of software
to the ipBTS C30.
Note:
The software release is necessary
only
if you need to
upgrade the version of software currently on the ipBTS C30.
In this guide, the software release image file is referred to as
<
software_image
>.
tar
. For more information about the
software image, contact your network planner.
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...