Chapter 3
l
ipBTS C30 installation
Powering on the RN
Airvana ipBTS C30 Installation and Commissioning, Release 4.0
3-9
•
Connect chassis to ground
•
Connect all cables and tighten to specifications.
•
Connect to power source.
Powering on the RN
The shelf is prewired to distribute power to the installed components like the ADCC, Radio
module and fan tray. The equipment rack containing the ipBTS C30 shelf must have a suitable
power supply and circuit breakers.
Connecting to the power source and powering on the ipBTS
Follow these steps to connect power to the ipBTS C30 RN and to power on the modules.
Procedure
1. Verify that the circuit breaker supplying power to the ipBTS shelf is in the OFF position.
2. Connect to your -48VDC power source at the rear of the shelf as shown in
Figure 3-9.
Connecting to a power source
3. After you connect the ground and power feeds and have tested the connections set the
circuit breaker to ON to power up the components of the ipBTS.
4. Monitor the ADCC and Radio module LED indicators to verify that the module is
operating normally. See the following sections,
for more information.
This completes the ipBTS installation process. Go to
on page 4-1 to
connect the RN to the CDMA network.
Verifying module status
As the ipBTS powers up look at the LED lights on the front of each module to verify that the
system powers up normally.
Input A
15 AMP
Input B
15 AMP
To power source
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...