Chapter 2
l
Planning
Requirements
2-2
910136 Rev01.00 Standard July 2007
Ground requirements
Airvana requires the installation of a primary surge protection system. Qualified
professionals must design the primary surge protection system compliant with
applicable local codes and requirements and with the
TIA J-STD-607-A-Commercial
Building Grounding (Earthing) and Bonding Requirements for Telecommunications
standards.
Ground
Operators connect the site ground connector on the rear of the ipBTS to a sufficient
ground source in the primary external surge suppression system.
Environmental requirements
list the ipBTS environmental requirements.
-48VDC-B
Input power, -48VDC
Input power feed A
-48RTN-B
Input power, -48VDC return
Input power feed B
Table 2-1.
Input power interfaces (continued)
Terminals
Functions
Table 2-2.
ipBTS operating and storage temperature specification
Specification
Value
Operating
Normal conditions: +5
°
C to +40
°
C
Short-term conditions: -5
°
C to +50
°
C
Storage and transportation
-40
°
C to +70
°
C
Table 2-3.
ipBTS humidity specifications
Specification
Value
Operating relative humidity
Normal conditions: 5 to 85 percent
Short-term conditions: 5 to 90 percent
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...