Airvana ipBTS C30 Installation and Commissioning, Release 4.0
3-1
Chapter 3
ipBTS C30 installation
This chapter describes the ipBTS C30 installation process, from unpacking the hardware
through installing the modules, cabling, connecting to a backhaul network and a power source
and then powering on the system. Specifically, it contains the following sections:
•
Preparing for the installation
•
•
Unpacking and installing modules
•
•
Connecting to the backhaul network
•
•
•
•
•
•
The installation process consists of the following high-level steps:
1. Planning for the installation (see
)
2. Preparing for the installation
3. Unpacking and installing the chassis.
4. Connecting the ground.
5. Unpacking and installing the modules.
6. Connecting the backhaul network.
7. Connecting to a power source.
8. Powering on the ipBTS C30 system.
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...