Chapter 3
l
ipBTS C30 installation
Connecting to a power source
3-8
910136 Rev01.00 Standard July 2007
Figure 3-7.
GPS connection - front of chassis
Figure 3-8.
GPS connection - rear of chassis
Connecting radio module sector ports
The radio module has three SMA connectors per sector on the front and rear of the module.
Below the radio module there are matching SMA connectors in the chassis that are pre-wired
at the factory. This procedure connects the nine short jumper cables to the SMA connectors on
the front and rear of the chassis.
Procedure
1. Connect one end of a jumper cable to an SMA port on the radio module.
2. Connect the other end of the jumper cable to the SMA port on the chassis directly below
the first connection.
3. Repeat
for the remaining eight SMA connectors.
4. Use the torque wrench to tighten each SMA connector to 1 N-m (9 in-lbs).
Connecting to a power source
Before connecting the ipBTS to the -48V power source follow the instructions in this section to
verify that all pre-power up steps have been completed.
Pre-power on checklist
Before connecting and applying power to the ipBTS verify that the following tasks have been
completed:
ADCC front
Chassis rear
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...