![Airspan AirSynergy3 Installation Manual Download Page 7](http://html.mh-extra.com/html/airspan/airsynergy3/airsynergy3_installation-manual_2879155007.webp)
AirSynergy3 Equipment Installation Guide
Page 7 | Commercial in Confidence SYN-UG-018
Figure 59- Reboot Confirmation
Figure 61- Edit Discovery tasks parameters
.................................................................................... 45
Figure 62 - Removing the existing stud mounting plates
............................................................... 49
Figure 63 - Fitting the stud joining plates
......................................................................................... 49
Figure 64 - Position back to back assembly on side to tighten all joining plate screws
Figure 65 - Mounting method with pole clamps recommended for back to back installations
Figure 68 - Flatten straps against the mounting plate for back to back installations
Figure 69 - Back to Back AirSynergy mounted on pole with 4 mounting straps
– M6 Screw fixing point as safety line anchor point
...................................................... 53
– AirSynergy Mains PSU and enclosure for USA deployments
.................................... 56
– Internal PSU and and cable terminations
..................................................................... 56