AirSynergy3 Equipment Installation Guide
Page 49 | Commercial in Confidence SYN-UG-018
Appendix B
– Field assembly of Back to back AirSynergy units
In cases where 2 AirSynergy radios are to be installed on the same mounting bracket some additional
installation steps are required as follows:
Removal of the existing stud mounting plates (4 positions) from each AirSynergy unit. Each plate is
secured with 2 countersunk head screws.
Figure 64 - Removing the existing stud mounting plates
Note: The screws should be replaced with a new set of 16 pieces with fresh
locking patches on the threads when re-assembling with the joining plates. A new
set of screws is supplied with the back to back joining kit.
Re-assembly with the joining plates. The studs with flange nuts must all be at the same end. A typical
arrangement will be with the AirSynergy with connectorised RF ports to be mounted at the back. The
mounting studs will then all be on the sides of the connectorised unit as shown in the figure. Fit all 4
plates to one of the AirSynergy units then slide the 2
nd
Synergy unit into place between the brackets.
Figure 65 - Fitting the stud joining plates