BluCube Installation and Maintenance Manual 7222094 V1.12.0_04_2016
Positioning
The installation position should be selected with the following points in mind:
• Position on a stable and even base, levelled to ensure that the compressor operates correctly.
• Levelling should be to +/- 5mm.
• Where vibration transmission to the building structure is possible, fit pad anti-vibration mounts.
• Observe airflow and maintenance clearances.
• Pipework and electrical connections are readily accessible.
• Where multiple units are installed, due care should be taken to avoid the discharge air from each unit adversely
affecting other units in the vicinity.
• Within a side enclosed installation, the fan MUST be higher than the enclosing structure.
• Ensure there are no obstructions directly above the fans.
• Allow free space above the fans to prevent air recirculation.
CAUTION
Prior to connecting services, ensure that the equipment is installed and completely level.
REAR
092 Models
LEFT
RIGHT
(1) Airflow clearance minimum
300(mm),
(2) Maintenance clearance
minimum:
Single unit minimum
750mm
FRONT
REAR
122 Models
LEFT
RIGHT
(1) Airflow clearance minimum
300(mm),
(2) Maintenance clearance
minimum:
Single unit minimum
750mm