
69
12.4.3.3 Configuring tramlining with the sequence calculation
1. From the work page, press button (1)
Settings
.
2. Press button (2)
Tramlining
to configure the tramlining.
3. Press button (6)
Sequence calculation
to configure the tramlining.
The different information displayed :
- (3) The different runs
- (4) Tramline diagram
- (5) Tramline or not and tramline type
- (6) Button for calculating the sequence
- (7) Starting direction indicated by the red dot (left or right)
- (8) Working width of the sprayer
Summary of Contents for Big Boss
Page 73: ...73 12 5 1 3 Icons ...