03
01
102-01
102-02
X
Y
Y
Y
126-06
126-06
126-07
102-02
102-01
03
. FITTING THE SIX RAILINGS
02
04
Bend each of the two railings
126-05
along the
fold line, in opposite directions. In order to judge
the exact angle of the bend, see steps 02 and 05.
This creates railings
X
and
Y
.
Railing
Y
is glued to deck covering
102-01
on the port
side of the aft superstructure, as shown.
NOTE:
In this photo, there is an AA gun fitted on the
upper deck of the superstructure (arrow). This gun will
be supplied and fitted in pack 12.
Take one of the two semicircular
railings
126-06
: this forms a
continuation to railing
Y
. The two pegs
on the lower edge of the railing are
glued into holes in the aft
superstructure deck
102-02
.
The railing
126-07
forms a
continuation to railing
126-06
: pegs on
the lower edge are glued into holes in
the deck covering
102-01
and the
superstructure deck
102-02
, as shown.
45
45
AGORA
MODELS
46
AGORA
MODELS