
3
Installing Intuvo 9000 GC Column
To Replace the 9000 GC/MS Tail
7000/7010 Series TQ GC/MS Operating Manual
65
18
Tighten the single compression bolt until you hear a click from the Intuvo
torque driver.
19
Loosely install the other compression bolt on the empty click and run bus
connector.
20
Pull the MS tail heater assembly a few millimeters towards the 9000 GC/MS
Tail until contact is made.
21
Close the MS tail heater assembly clamp, and hand tighten the thumb screw
to secure it.
22
Install the bus door on its hinges and close it.
23
Close the GC front door.
24
Install the tip seal and spring on the GC/MS interface. Align, gently slide, and
screw the tip seal into the tip seal holder. (See
25
Gently
check the alignment of the ion source and the interface tip seal.
When the ion source is aligned correctly, the front analyzer chamber can be
closed all the way with no resistance except the spring tension from the
interface tip seal.
26
You can align the ion source and interface tip seal by wiggling the side plate
on its hinge. If the door still will not close, contact your Agilent Technologies
service representative.
27
Close the front analyzer chamber. (See
CAUTION
Forcing the analyzer door closed if these parts are misaligned will damage the
tip seal or the interface or the ion source, or will keep the side plate from
sealing.