Appendix B - 64
Load (Internal)
•
Accept PCBA forward into Main Loader
—
Move PCBA from the
Left Loader forward onto the Main Loader.
•
Accept PCBA reverse into Main Loader
—
Move PCBA from the
Right Loader reverse onto the Main Loader.
Unload (Internal)
•
Eject PCBA forward from Main Loader
—
Move PCBA from the
Main Loader onto the Right Loader.
•
Eject PCBA reverse from Main Loader
—
Move PCBA from the
Main Loader onto the Left Loader.
Unload (External)
•
Eject PCBA forward from Main Loader
—
Move PCBA from the
Right Loader onto the output conveyor.
•
Eject PCBA reverse from Main Loader
—
Move PCBA from the
Left Loader onto the output conveyor.
Summary of Contents for 5DX II Series
Page 4: ... iv ...
Page 14: ......
Page 57: ...Installation 43 Installation INSTALLATION NOTES ...
Page 58: ...Installation 44 ...
Page 74: ...Appendix A 60 ...
Page 80: ...Appendix B 66 ...