Appendix A - 48
3-Phase
Wye
Load:
L1-to-L2
L1-to-L3
L2-to-L3
(22 A)
Input Wiring -
Terminal Block
Wiring -
3P1
3P2
3P3
3P4
3P5
3-Phase
with
Neutral
Load:
L1-to-N
L2-to-N
L3-to-N
(15 A)
Input Wiring -
Terminal Block
Wiring -
3N6
3N7
3N8
NOTE
When a wire is indicated as going to terminal number one, any
terminal numbered as one is the same. However, when there are two
wires shown going to a specific terminal, it is recommended that the
two wires be together. This has been done to remain within the
current capabilities of the terminal.
Table A-2
Agilent 5DX Power Source and Loading Configurations
Options
Power
Source
and
Loading
Input
Configuration,
Input Wiring,
and Terminal
Block Wiring
200
V
208
V
220
V
230
V
240
V
380/
220
V
400/
230
V
415/
240
V
L2
L1
L3
G
L2
L1
L3
N
Summary of Contents for 5DX II Series
Page 4: ... iv ...
Page 14: ......
Page 57: ...Installation 43 Installation INSTALLATION NOTES ...
Page 58: ...Installation 44 ...
Page 74: ...Appendix A 60 ...
Page 80: ...Appendix B 66 ...