Installation - 26
proceeding. For troubleshooting, refer to the
Service Guide (E7200-90028).
3.
Vacion™ Power Supply Voltage Check
— Use
a voltmeter and measure the Vacion Power Supply
at test point J04000 on the power supply. It is
located under the main unit in the rear. Measure
this at the BNC connector on the right of the
power supply. The reading may be as high as
3VDC but after warm-up (~1/2 hour) it should
read less than 10 mv.
Figure 11
Vacion Power Supply l
4.
Check Interlocks
— Tap each of the doors,
access panels and loaders with your hand. Watch
to see if the interlock LED on the control panel
goes off. If it does, adjustment of interlock
switches may be required. (Refer to the Service
Manual Safety Interlock Subsystem section)
VACION PUMP
POWER SUPPLY
INPUT
~200-240 V 60VA
POWER
ON
Measure voltage here
(J04000)
Summary of Contents for 5DX II Series
Page 4: ... iv ...
Page 14: ......
Page 57: ...Installation 43 Installation INSTALLATION NOTES ...
Page 58: ...Installation 44 ...
Page 74: ...Appendix A 60 ...
Page 80: ...Appendix B 66 ...