Installation - 41
Ins
ta
lla
ti
o
n
d.
From the top level
AutoUI
menu, select
Test
. Select
Board
. Follow the menu steps. Verify that the
images are clear and focused and that the test results
are acceptable (within customer expectations).
12.
Final Adjustments
— You will need to perform the
final adjustments listed below. In each case, refer to
system administration manual, section 7.
a.
Perform a photometric adjustment
b.
Perform a major X-Ray scan adjustment
c.
Exit from the
AutoUI
(return to DOS) and execute
fgcal 2
and
fgcal 4
(each will take about
five minutes) DOS will tell you when each is
finished.
d.
Type
auto
to return to the main menu and re-run
the self test.
13.
System Cleanup
— Replace all electronic bay
access panels and doors. Clean the system exterior
removing all dirt, hand prints, and so forth.
14.
Set the Clock
— Set the system clock to the
customer’s time zone.
15.
Check your work
— Verify that all steps are
complete and all boxes (like the one on the left) are
checked off.
16.
Complete Install Documentation
— Complete all
other hardware install related documentation and
provide copies to the customer.
(It is likely the
customer will need additional documentation - be
sure the customer is aware that local radiation
requirements must be met. This varies from state to
state and from country to country.)
Summary of Contents for 5DX II Series
Page 4: ... iv ...
Page 14: ......
Page 57: ...Installation 43 Installation INSTALLATION NOTES ...
Page 58: ...Installation 44 ...
Page 74: ...Appendix A 60 ...
Page 80: ...Appendix B 66 ...