©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
10-84
Chapter 10: Site Preparation – Power Requirements for Older Systems: Series 3 Power Requirements and Connections (Prior to May 2000)
Table 10-8
Series 3 and
79000
family power requirements (3-phase power)
E1135C
Power
Option
Voltage
Full-Load Amps (FLA)
1
for:
2
327X /
79000
3
317X
307X
3-phase
xDSL/POTS
Bay
1- phase
xDSL/POTS
Bay
4
Opts/Current
Testhead
Support Bay
3-Phase Wye w/ Neutral
AWW
120 /
208
[15]
5
14
[23] 18
[42] 28
NA
12
AWV, 16
05E
127 /
220
[15] 14
[23] 18
[42] 28
NA
12
AWZ, 16
0E5
220 /
380
[13] 10
[14] 10
[22] 18
NA
10
05M, 14
05L
230 /
400
[13] 10
[14] 10
[22] 18
NA
10
05F, 14
0E7
240 /
415
[13] 10
[14] 10
[22] 18
NA
10
05J, 14
3-phase Delta
0ED
200
[15] 14
[23] 18
[42] 28
NA
12
AWY, 16
05C
220
[15] 14
[23] 18
[42] 28
NA
12
0E3, 16
05H
230
[15] 14
[23] 18
[42] 28
NA
12
03G, 16
0E6
240
[15] 14
[23] 18
[42] 28
NA
12
0EH, 16
L1
L3
L2
N
G
L1
L3
L2
G