©
Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
3-5
Chapter 3: Site Preparation – Planning: The System Plan Drawing
Figure 3-2
Recommended Series I 3X79 telecom system layouts
Left-to-Right Layout
Control
Bay
Testhead
Strip
Printer
Keyboard
12 ft.
3.7 m
9 ft.
2.7 m
xDSL/ POTS
Bay
Support
Bay
Testhead
Strip
Printer
Monitor &
Keyboard
Control
Bay
9 ft.
2.7 m
14 ft.
4.3 m
xDSL/
POTS
Right-to-Left Layout
sitepx.wpg