d-lab.2, d-lab.2plus, netlab.2plus: Preinstallation
General
AgfaPhoto
2005-05-01 / PN 04100_01
1
1 General
1.1
Validity of this documentation
The Service Manual Preinstallation applies to the following machines:
Machines with gas laser:
d-lab.2
type
8060/260
d-lab.2plus type
8060/261
Machines with solid state laser:
d-lab.2 select
type 8060/803 and type 8060/804
d-lab.2 basic
type 8060/270 and type 8060/272
d-lab.2 (70mm)
type 8060/157 + 8060/255
d-lab.2plus select
type 8060/813 and type 8060/814
d-lab.2plus basic
type 8060/271 and type 8060/273
d-lab.2plus (70mm)
type 8060/158 + 8060/255
netlab.2plus basic
type 8060/505
1.2
Preparation by the Customer
The preinstallation is under the responsibility of the customer as well as of an authorized
local electrician. They must provide for a smooth installation by carrying out the following
preliminary jobs in the given order:
–
Preinstallation jobs carried out with care and completely terminated.
–
All connections and facilities checked.
–
Checklist (see further back) fully completed and returned to the AgfaPhoto Service
about two weeks before the installation.
1.3
Measures by the AgfaPhoto Technician
The AgfaPhoto Technician performs the following assignments at the agreed time:
–
Installation of the machine
–
Mixing and filling in the chemistry (in collaboration with the customer and/or
operator).
–
Mechanical and electrical functional tests of the machine.
–
Production check
–
Brief introduction of the handling for the customer or operator. Explanation of the
measures required in case of problems.