Power Supply
d-lab.2, d-lab.2plus, netlab.2plus: Preinstallation
14
2005-05-01 / PN 04100_01
AgfaPhoto
5 Power
Supply
5.1 On-Site
Connections
CAUTION!
The permanent on-site connection must be made by an authorized electrician
who is also responsible for this job.
The connections for the machine must be installed by a local electrician according to the
data listed in the following sections. Thereby the following facts should be considered:
–
The power connecting cable must be run up to the Minilab.
–
Plan for a circuit breaker to cut the machine off the mains.
–
If you want to use the integrated strain-relief consider the outer diameter of the power
cable. This must be within a range of at least 13 mm to maximum 18 mm.
–
For the connection of the PE conductor, a cable lug with a hole diameter of about
6 mm must be used or, if solid conductors (wires) are used, an appropriate lug must be
bent.