d-lab.2, d-lab.2plus, netlab.2plus: Preinstallation
Index
AgfaPhoto
2005-05-01 / PN 04100_01
51
N
Network board
46
Network connection
13
Noise level
13, 43
O
Operating conditions
13
machine storage
13
transport 13
Operating system
45
Operation Manuals
37
Operation site
7
Options 43
Order numbers
consumables 37
Minilab
d-lab.2 basic
28
d-lab.2 select
26
d-lab.2/2plus Spezial-Version 70mm
34
d-lab.2plus basic
32
d-lab.2plus select
30
netlab.2plus basic
35
Operation Manuals
37
remote service
36
P
Paper magazines
Technical data
47
Paper transport
Paper Processor
49
Printer 47
Paper, storage
8
Preinstallation measures
1
Print sizes
43
Process specifications
48
Production capacity
44
R
Remote service
36
Replenishment rates
Default values
48
Required space
machine 8
operation, service
8
Room height
7
Room lighting
9
Room temperature
13
Room ventilation
11
S
select
25
Slide formats (only d-lab.2/2plus)
43
Space requirement
operation, service
43
Storage (paper)
8
Storage and transport (machine)
13
Supply systems
contractors 23
T
Tank capacity
48
Technical data
Complete system
41
electrical requirements
43
heat emission
49
Main computer
45
noise level
43
Paper magazines
47
Paper Processor
48
prescanner / scanner
46
Printer 47
Temperatures
Chemical solutions
48
Timer Board
46
Transport system
49
Type numbers
41
W
Water connection
9
Weight empty
d-lab.2 6
d-lab.2plus 6
netlab.2plus 6
Weight filled