6.
Tap the Record icon (for example, on the
corner of the field between the field and
headland).
7.
To pause the recording (for example, if there
is a straight part in the field), tap the Pause
icon.
The recording makes a straight line between
the Pause and Continue recording taps.
8.
Tap the Continue recording icon to continue
recording.
9.
Drive to end of the field.
10.
Tap
to accept.
Parallel waylines show on the left (negative
numbers) and right (positive numbers) side of
the tractor. The system calculates the
wayline intervals from the preset implement
width and overlap.
GUID-4240D2B4-58AD-4BC0-A847-32B4484964D7-low.jpg [Low]
Fig. 33
(1)
Record
(2)
Contour wayline
(3)
End of wayline
(4)
Start of wayline
4.4.5.3 Make an angle wayline (A+ heading)
Procedure
1.
Open the Map screen
AUTO
.
2.
Select a field.
GUID-A6B96EA4-4CCF-4310-9935-494DF9A2B6D9 [V2]
4. Valtra Guide operation
Smart farming
69
39 924 21 5
Summary of Contents for Valtra Smart farming
Page 1: ...OPERATOR SMANUAL Smartfarming 39 924 21 5 01 2020 YOUR WORKING MACHINE...
Page 7: ...Table of contents 12 Smart farming 39 924 21 5...
Page 11: ...Table of contents 16 Smart farming 39 924 21 5...
Page 17: ...Table of contents 22 Smart farming 39 924 21 5...
Page 99: ...Table of contents 104 Smart farming 39 924 21 5...
Page 109: ...5 Section Control operation 114 Smart farming 39 924 21 5...
Page 111: ...Table of contents 116 Smart farming 39 924 21 5...
Page 125: ...Table of contents 130 Smart farming 39 924 21 5...
Page 131: ...Table of contents 136 Smart farming 39 924 21 5...
Page 137: ...Table of contents 142 Smart farming 39 924 21 5...
Page 141: ...Table of contents 146 Smart farming 39 924 21 5...
Page 153: ...10 Troubleshooting 158 Smart farming 39 924 21 5...
Page 155: ...Table of contents 160 Smart farming 39 924 21 5...