48 Operation
4510012 - REV F – 220621
After the Boiler is full, as evidenced by the Sight Glass being approximately half full, wait
approximately 10 minutes until the Boiler Pressure Gauge stabilizes at 40–80 PSIG.
IMPORTANT:
The High Limit Control and Operating Pressure Controls are preset at
the factory and do not need to be adjusted.
Turn on the Conveyor by clicking the Conveyor Power Switch up.
Verify that the two Sight Glass Valves are open (turned clockwise).
Verify that the Drip Valve at the bottom of the Sight Glass is closed.
Once the Conveyor is on, adjust the dials on the Conveyor Controller to set the speed
desired for label shrinking. It is recommended to start with 25-30 on the Speed Control
setting for the Conveyor.
AFM-4510012-00040-01
Conveyor Controller
Power Switch
AFM-4510012-00025-01
Sight Glass
Valves
Drip
Valve
Sight
Glass
AFM-4510012-00025-01
High Limit
Pressure
Control
Tab
Summary of Contents for STC-WSN300-2M
Page 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Page 2: ...2 Abbreviations 4510012 REV F 220621 ...
Page 8: ...8 Abbreviations 4510012 REV F 220621 ...
Page 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Page 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Page 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Page 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Page 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Page 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Page 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...