Operation 49
4510012 - REV F – 220621
NOTE:
If the pressure exceeds 85 PSIG, a Pressure Tab on the top of the High Limit
Pressure Control pops out and needs to be reset by pushing it down.
Run some test product through the Steam Tunnel and adjust Conveyor speed and
Manifolds as needed.
If desired, regulate the speeds of the upstream Conveyor, Sleever, and Timing Screw for
maximum results.
Summary of Contents for STC-WSN300-2M
Page 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Page 2: ...2 Abbreviations 4510012 REV F 220621 ...
Page 8: ...8 Abbreviations 4510012 REV F 220621 ...
Page 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Page 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Page 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Page 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Page 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Page 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Page 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...