38 Operation
4510012 - REV F – 220621
Verify that the Boiler Controller Power Switch is off.
Close the Steam Valve (perpendicular to the line).
Close the Blowdown Valve (perpendicular to the line).
Confirm that the Water Inlet is connected to a filtered or softened water source.
Confirm that the Water Outlet is connected to a suitable drain.
Confirm that the Blowdown Outlet is connected to a Blowdown Tank or drain using a
0.75” (19,.1 cm) Blowdown Hose rated for high temperature steam.
Steam Valve
(Closed)
Blowdown Valve
(Closed)
AFM-4510012-00037-01
AFM-4510012-00038-01
AFM-4510012-00039-01
AFM-4510012-00040-01
Blowdown
Outlet
Water
Outlet
Blowdown
Tank
Summary of Contents for STC-WSN300-2M
Page 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Page 2: ...2 Abbreviations 4510012 REV F 220621 ...
Page 8: ...8 Abbreviations 4510012 REV F 220621 ...
Page 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Page 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Page 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Page 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Page 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Page 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Page 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...