Innovation Water Heaters Installation, Operation & Maintenance Manual
CHAPTER 3 – OPERATION
OMM-0078_0M
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
37
of
216
GF-128
Phone: 800-526-0288
09/11/2015
CHAPTER 3. OPERATION
3.1 INTRODUCTION
The information in this Chapter provides a guide to the operation of the Innovation Water Heater
using the Control Panel mounted on the front of the unit. It is imperative that the initial startup of
this unit be performed by factory trained personnel. Operation prior to initial startup by factory
trained personnel will void the equipment warranty. In addition, the following WARNINGS and
CAUTIONS must be observed at all times.
CAUTION
All of the installation procedures in Chapter 2 must be completed before
attempting to start the unit.
WARNING!
ELECTRICAL VOLTAGES IN THIS SYSTEM INCLUDE 120 AND 24
VOLTS AC. IT MUST BE SERVICED ONLY BY FACTORY CERTIFIED
SERVICE TECHNICIANS.
WARNING!
DO NOT ATTEMPT TO DRY FIRE THE UNIT.
STARTING THE UNIT
WITHOUT A FULL WATER LEVEL CAN SERIOUSLY DAMAGE THE
UNIT AND MAY RESULT IN INJURY TO PERSONNEL OR PROPERTY
DAMAGE. THIS SITUATION WILL VOID ANY WARRANTY.
3.2 CONTROL PANEL DESCRIPTION
The Innovation Control Panel shown in Figure 3-1 contains all of the controls, indicators and
displays necessary to operate, adjust and troubleshoot the Innovation Water Heater. These
operating controls, indicators and displays are listed and described in Table 3-1. Additional
information on these items is provided in the individual operating procedures provided in this
Chapter.