Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual
CHAPTER 6 – SAFETY DEVICE TESTING
OMM-0082_0J
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
77
of
192
GF-130
Ph.: 800-526-0288
05/21/2014
CHAPTER 6. SAFETY DEVICE TESTING
6.1 TESTING OF SAFETY DEVICES
Periodic safety device testing is required to ensure that the control system and safety devices
are operating properly. The boiler control system comprehensively monitors all combustion-
related safety devices before, during and after the start sequence. The following tests check to
ensure that the system is operating as designed.
Operating controls and safety devices should be tested on a regular basis or following service or
replacement. All testing must conform to local codes such as ASME CSD-1.
NOTE
MANUAL and AUTO modes of operation are required to perform the
following tests. For a complete explanation of these modes, see Chapter 3.
NOTE
It will be necessary to remove the front door and side panels from the unit
to perform the following tests.
ELECTRICAL VOLTAGES IN THIS SYSTEM MAY INCLUDE 120 AND 24
VOLTS AC. POWER MUST BE REMOVED PRIOR TO PERFORMING
WIRE REMOVAL OR OTHER TEST PROCEDURES THAT CAN RESULT
IN ELECTRICAL SHOCK.
WARNING