Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual
Page
192
of
192
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0082_0J
05/21/2014
Ph.: 800-526-0288
GF-130
© AERCO International,
Inc., 2014
Change Log:
Date
Description
Changed By
03/19/2014
Rev I:
PIR 780
: replaced mechanical latch with magnetic
PIR 981
: Expanded Table A in Appendix F Part List
PIR 934-33
: Modified step 13 in Combustion
Calibration regarding defective O
2
Sensor.
PIR 934-37
: Modified Blocked Inlet Switch Test
instructions, section 6.8.2.
PIR 960
: Addition of two sub-sections in 2.10.12;
addition of section 2.15 Sequencing Isolation Valve
Installation; 3.9 _BST Menu; addition of Chapter 10
– Boiler Sequencing Technology; replaced all wiring
schematics in Appendix I, addition of 24V
Sequencing Valve & Flame Rod Amplifier.
PIR 974
: Replaced Gas train harness 161450 with
63147 in Appendix G.
PIR 1000
: P/N 61026 now labeled “Lean Oxygen
Sensor,” 64081 now named “ECU”
PIR 1005:
Changed 12 Month Maintenance Kit part
number to 58025-01
Chris Blair
05/21/2014
Rev J:
PIR 749
: Added Propane to section 2.8 Gas supply
Piping; new Propane combustion calibration section
4.4; modified sections 6.2 & 6.3; added Propane
gas train 22140-3 drawings to Appendix G.
PIR 934-65
: Added explanatory paragraph & note to
section 2.15 – Sequencing Isolation Valve
Installation
Chris Blair