
Site Preparation and Installation Supplement
Table of Contents
Advanced Dicing Technologies Ltd
.
vi
TABLE OF CONTENTS
Installing the System _________________________ 1
Specifying System Elements __________________ 2
Workpieces _______________________________________________ 2
Blades ____________________________________________________ 2
Broken Blade Detector (Optional) _____________________________ 2
Spindle ___________________________________________________ 3
X-Axis (Feed) ______________________________________________ 3
Y Axis (Indexing) ___________________________________________ 3
Z Axis (Cut Depth) __________________________________________ 4
Theta-Axis (Rotational) ______________________________________ 4
Vision System _____________________________________________ 4
Display ___________________________________________________ 4
Preparing the Site ___________________________ 5
Environmental Requirements _________________________________ 5
Electricity Supply __________________________________________ 5
Electric Supply Specification ___________________________________ 5
Water ____________________________________________________ 6
Water Composition Requirements (Maximum Values) _______________ 6
Cutting Water Supply (De-ionized Water) _________________________ 6
Spindle Cooling Water Supply __________________________________ 7
Drain and Exhaust __________________________________________ 7
Water Drain ________________________________________________ 7
Mist Exhaust _______________________________________________ 8
Pneumatics _______________________________________________ 8
Site Dimensions____________________________________________ 8
System Dimensions __________________________________________ 9
Center of Gravity ____________________________________________ 9
Installation Site _____________________________________________ 9
Performing System Installation _______________ 10
Receiving the System ______________________________________ 11
Initial Inspection __________________________________________ 11
Unpacking the System _____________________________________ 12
Uncrating the System _______________________________________ 13
Releasing All Moveable Parts and Unsealing the System ____________ 15