ADT Model 7900 Uno Dicing Series Installation Supplement
Performing System Installation
P/N 97910-9000-001-01 Ver. 04/2014
25
4.8
Connecting the Main Power Cord to the Power
Supply
For CE Marked systems - connect the main power cord to the main
circuit breaker on the wall. No plug is used.
For non-CE Marked systems - connect the main power cord plug to the
main power utility outlet.
Note:
At this stage, the external water and air utilities supplied to the system
are connected, as well as the air exhaust and the water drain.
4.9
Setting Date and Time Properties
Note:
The system can work, even if the date and time are incorrect.
However, the automatic back-up in real time is enabled only when date and
time are set appropriately.
To reset the time properties:
1.
Using the keyboard, press
Control
and
Escape
.
2.
Press the hour displayed at the right bottom area of the screen.
3.
In the Date and Time Properties, choose
Time Zone
.
4.
From the drop-down box, select the relevant time zone and press
Apply
.
5.
Select the
Date & Time
view and set the correct date and time.
6.
Press
Apply
and then
OK
.
4.10
Installing the Chuck
Installing the Chuck includes the following sections. We recommend that
you familiarize yourself with the information described in General
Precautions before you install the chuck:
General Precautions on page 25.
Securing the Cutting Chuck to the Theta Table on page 26.
Testing Chuck Flatness on page 27.
4.10.1
General Precautions
In addition to the safety precautions described at the beginning of this
manual, take the following precautions to ensure accuracy of
measurement.
Before taking measurements, ensure that the range of motion
required for testing will not cause the Spindle or any Axis, to collide
with the probe.
Keep the speed of movement for each Axis to a minimum during
measurements.