
Site Preparation and Installation Supplement
Installing the Blades
Advanced Dicing Technologies Ltd
.
32
INDEX
A
Anchoring the Machine, 23
B
BBD, 2
Blade
Change, 29
Installing, 29
Specification, 2
C
Center of Gravity, 9
Chuck
Securing to Theta Table, 26
Testing Flatness, 27
Chuck to Non Chuck
Measuring Delta, 31
Cooling Block, 2
Cut Stroke, 3
E
Electricity supply, 5
Spcifications, 5
Environment requirements, 5
Exhaust
Mist, 8
Exhaust Connection, 24
External Circuit Breaker, 6
F
Feed Rate range, 3
Feed Rate Stability, 3
I
Indicators
Shock Watch, 11
TipWatch, 11
Installation, 10
J
Jig
X, 17
Y, 16
Y2 and Z, 16
L
Leveling Mounts, 21
M
Main Power
Cord, 10, 25
P
Parts and Accessories Shipped with the System, 19
Pneumaics, 8
S
Securing the Machine to the Facility, 23
Shipping Bracket
Left, 14
Shipping Brackets
Right, 14
Site Dimentions, 8
Spcifications
X-Axis, 3
Specifications
Blade, 2
Display, 4
Theta Axis, 4
Y-Axis, 3
Z-Axis, 4
Spindle, 3
System Utilities Connections, 23
T
Theta
Table, 21
Theta-axis, 4
U
Unpacking, 12
V
Vision System, 4
W
Water, 6