
ADT Model 7900 Uno Dicing Series Installation Supplement
Performing System Installation
P/N 97910-9000-001-01 Ver. 04/2014
23
4.6
Securing the System to the Production Floor
Upon request, ADT can supply you with a special kit for securing the
system to the floor. For more information, contact your ADT Customer
Support representative.
4.7
Connecting Utilities to the System
Caution:
The utilities must be connected by the ADT Customer Support
representative only. Do not allow anyone other than the representative to
connect the utilities to the system as any damage caused will not be covered
by the system warranty.
Note:
The system utility specifications are detailed in Table 25. System
To connect utilities to the system (ADT Customer Support rep):
1.
Flush the water and air supply pipes, for at-least 10 minutes, before
connection to the system.
Caution:
Failure to do so could result in foreign matter entering crucial parts
of the pneumatic system.
2.
Connect all utilities to the system according to the requirements listed
in Table 25. System Utility Connections. Figure 12. Exhaust
Connection and Figure 13. Utility Connection Points indicate the
points of connection.
Caution:
Make sure that the drain pipe on the wall side is installed no higher
than 400 mm from the floor and allows a free water flow.