
Site Preparation and Installation Supplement
Site Dimensions
Advanced Dicing Technologies Ltd
.
10
4.
PERFORMING SYSTEM INSTALLATION
Performing System Installation describes the procedures for receiving,
unpacking and installing the system, and the tests and adjustments that
must be performed after installing the system.
Note:
The test procedures referred to in the Field Acceptance Test
Supplement Should also be performed (document P/N 97910-9007-000-XX).
Note:
If fastening the system to the floor is required, contact ADT and
request the securing kit.
Read the instructions carefully before beginning the installation, and
allow enough time to complete all of the tests and adjustments after
installation.
Note:
These procedures should be performed by trained and experienced
personnel.
Performing System Installation includes the following:
Receiving the System on page 11.
Initial Inspection on page 11.
Unpacking the System on page 12.
Parts and Accessories Shipped with the System on page 19.
Positioning the System on your Production Floor on page 21.
Securing the System to the Production Floor on page 23.
Connecting Utilities to the System on page 23.
Connecting the Main Power Cord to the Power Supply on page 25.
Setting Date and Time Properties on page 25.
Installing the Chuck on page 25.
Installing the Blades on page 29.
Follow these installation instructions in the order in which they appear.