Supplying Power to the Timeclock and Verifying Operation
Series 4000 Badge Timeclock Installation Guide
2-21
Supplying Power to the Timeclock and Verifying
Operation
The illustrations in this section assume that you have installed the backup battery,
and that you ran the Ethernet cable through the wall and into the back of the
timeclock. However, the procedure in this section applies to
all
installation
scenarios.
Supplying Power to the Timeclock
1. Remove the mylar strip from the lithium battery located on the main board in
the cover of the timeclock.
Summary of Contents for Series 4000
Page 4: ......
Page 8: ...Checklist of Installation and Configuration Tasks viii ADP Inc ...
Page 16: ...Chapter 1 Before You Install the Series 4000 Timeclock 1 8 ADP Inc ...
Page 56: ...Chapter 4 Troubleshooting Hardware and Operational Problems 4 4 ADP Inc ...
Page 62: ...Appendix A Replacing a Series 400 Timeclock with a Series 4000 Timeclock A 6 ADP Inc ...