
EURODIM TWIN TECH
User Manual - page 33
Issue 2.1
www.adbstagelight.com
7.1 Outputs to the loads
The cabling compartment with output terminals is on the right hand side. The load
terminals are mounted next to the relevant module. The numbering is shown on self-
adhesive labels.
These terminal blocks are suitable for cable sizes up to 10 mm
²
. Special Adaptors are
available for cables up to 25 mm
²
when installing 10 kW circuits. Grey = L ; blue = N.
The load cables must be sized in accordance with local regulations. Increased sizes may
be required in order to reduce the voltage drop on the line to the luminaire. We suggest
limiting the voltage drop to 3%.
The data cables may follow the power cables on the condition that they are minimum 250
mm apart or in a separate shielded trucking (e.g. steel tube). Sound and video cables
must be kept at a minimum distance of 500 mm from all power cables. If cables or ducts
have to cross, then a crossing at right angles will reduce interferences.
7.2 Identification of the dimmers
The dimmers in a cabinet are identified by [slot number].[dimmer in the module]. Example:
dimmer 2.3 is the third dimmer in the second module of the cabinet.
The pre-printed label also shows the module’s supply phase. Custom labelling of the
terminals is possible, e.g. the outlet or channel number.
7.3 Load terminals for 4 x 2.5 / 3 kW modules
Use all four pairs (L+N) of output terminals. Please also see drawing N° 3500.01.650
7.4 Load terminals for 3 x 5 kW modules
Use only the first three pairs (L+N) of output terminals. Do not use the fourth pair, labeled
x.4.
Pay attention when fasting the load cables and tightening the terminal screws!
Do not over tighten the screws, do not use power tools (e.g. electric drill machines) –
this may damage the terminals, and they will need to be replaced. This is a time
consuming operation!
Maximum torque = 1.2 NM
.
Summary of Contents for EURODIM Twin Tech
Page 1: ...M 3213 1106 01 213 Installation Manual V 1 2 EURODIM Twin Tech ...
Page 2: ......
Page 13: ...EURODIM TWIN TECH User Manual page 11 Issue 2 1 www adbstagelight com 3 DESCRIPTION ...
Page 50: ...EURODIM TWIN TECH User Manual page 48 Issue 2 1 www adbstagelight com 3 8 8 142 990 596 216 ...
Page 63: ...EURODIM TWIN TECH User Manual page 61 Issue 2 1 www adbstagelight com 14 CONFIGURATION TABLES ...
Page 65: ...EURODIM TWIN TECH User Manual page 63 Issue 2 1 www adbstagelight com ...
Page 67: ...EURODIM TWIN TECH User Manual page 65 Issue 2 1 www adbstagelight com Notes ...
Page 68: ......
Page 70: ......
Page 71: ...M 3213 E 09p Subject to modifications www adbstagelight com info adblighting com ...