4 INSTALLATION
4.1 Dimmer room
4.1.1 Preparation
Determine the dimensions of the dimmer room so as to place all EURODIM Twin Tech
cabinets easily. Provide for an open space of approximately 90 cm in front of the cabinets
to facilitate maintenance. Before attempting to move the rack(s) into the final position,
check access routes to the dimmer room for space to manoeuvre through doorways and
around corridor corners. The cabinets can be placed against a wall, side by side or back to
back. The supply cables and the load cables can enter the wiring compartment either from
the top or bottom of the cabinet. See drawing for size and location of cable entries.
RISK OF FIRE
Install only on concrete or other non-combustible floor
Dimmer Room Requirements
•
A clean (not dusty) temperature-controlled environment.
•
Restricted public access to prevent any unauthorized tampering with the
dimmer settings.
•
Soundproofing or performance area separation to muffle ventilation fan
noise. Acoustic measurements are available from ADB Lighting
Technologies.
•
Provide for a free space, minimum 30 cm above the EURODIM Twin Tech
so as to facilitate the exhaust airflow. If an optional “Silencer” is used, then
more space may be necessary. The dimensions and weight of the cabinets are
included in the Chapter “Characteristics”. Plan for fire extinguishers in
compliance with local regulations. The lighting of the area should be
sufficient for maintenance and inspection. A level of 300 lux is considered
satisfactory. Plan for mains outlets in the room, independent of the supply
of the dimmers.
Plan for an Ethernet network to the control room and a cable for remote “CPU1 - CPU2”
selection (if applicable).
EURODIM Twin Tech cabinets are professional equipment and relevant safety rules are
applicable. EURODIM Twin Tech cabinets should be placed in areas that are accessible
only to persons responsible for maintenance, surveillance or repair of the equipment.
Please refer to local regulations and requirements.
The equipment shall be installed and serviced by skilled and trained personnel exclusively.
Such an area should be located as close as possible to the stage or studio, in order to
reduce the length of the electrical cables, and therefore, the cost of installation. At the time
of installation of the cabinets in the area, it should be completely unobstructed; that is, that
all engineering work, wall or floor covering work, painting, electric lighting work, drilling,
Summary of Contents for EURODIM Twin Tech
Page 1: ...M 3213 1106 01 213 Installation Manual V 1 2 EURODIM Twin Tech ...
Page 2: ......
Page 13: ...EURODIM TWIN TECH User Manual page 11 Issue 2 1 www adbstagelight com 3 DESCRIPTION ...
Page 50: ...EURODIM TWIN TECH User Manual page 48 Issue 2 1 www adbstagelight com 3 8 8 142 990 596 216 ...
Page 63: ...EURODIM TWIN TECH User Manual page 61 Issue 2 1 www adbstagelight com 14 CONFIGURATION TABLES ...
Page 65: ...EURODIM TWIN TECH User Manual page 63 Issue 2 1 www adbstagelight com ...
Page 67: ...EURODIM TWIN TECH User Manual page 65 Issue 2 1 www adbstagelight com Notes ...
Page 68: ......
Page 70: ......
Page 71: ...M 3213 E 09p Subject to modifications www adbstagelight com info adblighting com ...