USER’S MANUAL V-line AdBlue
®
47xx.xxx
13
The AdBlue
®
dispenser can be joined only to process equipment (tanks, piping) of perfect tightness and
cleanness. The supplier of the process equipment is responsible for its tightness and cleanness.
Prior to the installation the organisation shall perform the inspection of used power and communication
cables.
The dispenser is mounted to the base frame M12 × 70 bolts through special pads (pads are supplied
dispenser).
When the AdBlue
®
dispenser is installed, they shall check the tightness, function of hydraulic equipment of
the dispenser, supply piping and fittings. They also check power and communication cables including their
lines and fixing.
Prior to official metrological testing the dispenser (every dispensing nozzle) has to operate for min. 5
minutes in max. flow rate
The process and service equipment of filling stations can be operated only when they have been built
up according to the approved design and on the basis of positive result of licence regime.
7.2.
Wiring
ATTENTION!
For safety operation must be used electrical connection of AdBlue
®
dispenser
from switchboard with
oveload protection and for parameters 230 V / 50 Hz / Power supply of electronics and heating – see
article 5 -
TECHNICAL DATA
Earthing conductor shall be connected to the shaft under every dispenser.
Leads to the AdBlue
®
dispenser must be sealed to prevent its interior from the penetration of liquids
(AdBlue
®
) or vapours. Only cable terminals resistant to AdBlue
®
effect can be used in the shafts under
dispensers. The cable bushings can always be used for one cable only.
ATTENTION!
Emergency switching off: It shall be enabled to switch off the filling equipment from one point, which
is accessible anytime. The electric equipment situated in the explosion hazard area can be switched
off by means of the emergency breaker located outside the explosion hazard area. The switch for
normal operation can be also used as emergency breaker.
Supply conductors are connected to the junction box located in the dispenser.
The communication line cable is connected to the junction box for the communication line.
There are two wiring systems of the filling station: either the communication line is connected to the
dispenser (i.e. self-service operation with the control system) or not (i.e. service operation).
The dispenser in self-service operation
with the control system is connected through the communication
line to the control system which controls operation of complete filling station (i.e. dispenser release,
preselection of volume and price, unit price alteration, selfdiagnostics, etc.).
8.
PUTING INTO OPERATION
ATTENTION!
Before start must be made revision of wiring. Also is recomended to heat imide container space to
minimum temperature 5 °C (start the heater if needed).
8.1.
Puting of the AdBlue
®
dispenser to operation mode
Hang up the delivery nozzle.
Switch on the power supply in main board of filling station
(electronics supply in winter and heating)
.
By hang out of delivery nozzle will be made display test (test of eights), when the eights will be
zerowed the delivery can be started.
Place the nozzle in.
In case of turn on of DU with hang out nozzle must bet he nozzle hunged in and hanged out again, to
activate DU (reset display).
After this is possible to provide delivery of AdBlue
®
.
Summary of Contents for AdBlue V-line 47 Series
Page 2: ......
Page 11: ...USER S MANUAL V line AdBlue 47xx xxx 7 Figure 2 ...
Page 28: ......
Page 33: ...USER S MANUAL V line AdBlue 47xx xxx Enclosure No 5 ...