Chapter 7: Scheduling Recurring or Resource-Intensive Jobs
●
82
Scheduling a Task
If a task is lengthy and limits access to components on your storage space, you may want to set
a date and time for the task to complete, instead of running the task while there is activity on
your storage space.
If a task must be performed regularly, you can schedule it to recur at preset times.
You can schedule these Adaptec Storage Manager tasks:
●
Expanding a logical drive
●
Changing a logical drive’s RAID level
●
Modifying the stripe size of a logical drive
●
Verifying a logical drive
●
Verifying and fixing a logical drive
To schedule one of these tasks:
1
Complete each step of the task until you are prompted to click
Apply
. (
Don’t
click
Apply
.)
2
Click
Schedule
.
The schedule window opens. (The window you see may be different from the one shown
in this example, depending on which type of task you are scheduling.)
Schedule button