311
Copyright © Acronis, Inc., 2000-2010
Plans and tasks
Displays a list of the plans (both local and centralized) and tasks existing on the selected machine.
Operations
The following is a guideline for you to perform operations with backup plans and tasks.
To
Do
View details of a plan/task
Backup plan
Click
View details
.
In the
Plan Details
(p. 195) window, review the plan details.
Task
Click
View details
.
In the
Task Details
(p. 193) window, review the task details.
View plan's/task's log
Backup plan
Click
View log
.
You will be taken to the
Log
(p. 196) view containing the list of the plan-related
log entries.
Task
Click
View log
.
You will be taken to the
Log
(p. 196) view containing the list of the task-related
log entries.
Run a plan/task
Backup plan
Click
Run
.
In the
Run Backup Plan
(p. 193) window, select the task you need to run.
Running the backup plan starts the selected task of that plan immediately in spite
of its schedule and conditions.
Task
Click
Run
.
The task will be executed immediately in spite of its schedule and conditions.
Stop a plan/task
Backup plan
Click
Stop
.
Stopping the running backup plan stops all its tasks. Thus, all the task operations
will be aborted.
Task
Click
Stop
.
What will happen if I stop the task?
Generally, stopping the task aborts its operation (backup, recovery, validation,
exporting, conversion, migration). The task enters the Stopping state first, then
becomes Idle. The task schedule, if created, remains valid. To complete the
operation you will have to run the task again.