61
“Blue Edge” Trouble Shooting:
I. Re-adjust “Overfill” first.
For Overfill Re-adjustment:
i. Those 2 Adjustment Screws must be released for around 2 mm first.
ii. Alignment Sequence:
a.
To adjust “Horizontal Adjustment Screw” firstly, then “Vertical Adjustment
Screw”.
b.
Refer to below Figure.
II. Re-assemble LP module—include LP, LP Baffle, LP clip.
(2) Overfill Vertical
Adjustment Screw
(1) Overfill Horizontal
Adjustment Screw
Summary of Contents for X1130 Series
Page 16: ...16 Product Overview ...
Page 17: ...17 ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 42: ...42 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Page 53: ...53 This cord location is here First assy Blower module Second assy Mylar Ballast ...
Page 54: ...54 3 Blower wire alignment This clip must be screwed by this direction ...
Page 58: ...58 11 Lamp Door screw assemble sequence First Second Third ...
Page 62: ...62 Power Supply Problems Checking Flow ...
Page 63: ...63 ...
Page 76: ...76 ...
Page 77: ...77 Module 2 ASSY UPPER CASE ...
Page 78: ...78 Module 3 ASSY LOWER CASE ...
Page 79: ...79 Module 4 ASSY FRONT CASE ...