32
6. Click “Save” to save data into the assigned file name.
7. Change new Main board:
(1) Unplug power cable and RS232 cable from projector, and change new Main board
into Projector.
(2) After changing Main board, reconnect power cable and RS232 cable into Projector.
8. Write S/N & data into new Main board:
Press “Retrieve System” and write Data & SN to projector.
9. “Load from data” & “Retrieve System” :
(1) Click “Load from data” and select load file.
(2) Click “Retrieve System” to write the values into main board.
6-1. Click “Save” icon.
6-2. This window will
pop out, and it shows
the file saving folder.
6-3. Enter file name here.
Suggest to use Serial
Num as the file name.
6-4. Click “Save” to save
data.
9-1. Click “Load From
Data” to load data.
9-2. Select the file
source
9-3. Click “Load” to
finish file load.
10. Click “Retrieve System”
to write data.
Summary of Contents for X1130 Series
Page 16: ...16 Product Overview ...
Page 17: ...17 ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 42: ...42 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Page 53: ...53 This cord location is here First assy Blower module Second assy Mylar Ballast ...
Page 54: ...54 3 Blower wire alignment This clip must be screwed by this direction ...
Page 58: ...58 11 Lamp Door screw assemble sequence First Second Third ...
Page 62: ...62 Power Supply Problems Checking Flow ...
Page 63: ...63 ...
Page 76: ...76 ...
Page 77: ...77 Module 2 ASSY UPPER CASE ...
Page 78: ...78 Module 3 ASSY LOWER CASE ...
Page 79: ...79 Module 4 ASSY FRONT CASE ...