38
Module Assembly Key Point - Optical Engine
1. Light Pipe Module assembly and overfill alignment
1.1 Assembly LP Module to HSG DMD
(3) Assembly two Overfill adjustment screws to HSG DMD (Fig. 1-1).
** Adjustment criteria refer to below item
(4) Assembly “Clip LP” and lock with screw well (Fig. 1-2).
(5) Press CLIP of RE_BKT_LP first, and then push it into the hole (Fig. 1-3).
(6) Placed LP Module on LP datum of “DMD HSG” and adjustment screw well (Fig.1-4).
(7) Assembly “Baffle LP” first (Fig. 1-5-1) & push “Baffle LP” to hook DMD HSG, and then
lock with screw well (Fig. 1-5-2).
1.2 Overfill Adjustment @ LP Module
Overfill Adjustment Criteria:
(1) Pre-assembly 2 adjusting screws. Criteria shown as Fig.1-6.
(2) Alignment Sequence:
a. To adjust “Horizontal Adjustment Screw” firstly, and then “Vertical Adjustment
Screw”.
b. Refer to Fig. 1-6.
(3) For Overfill Re-adjustment:
a. Those 2 Adjustment Screws must be released closely to the “Pre-assembly”
positions first.
b. Follow adjustment steps shown in Item 4.6-ii.
Fig. 1-1
Fig. 1-2
Overfill Vertical
Adjustment Screw
Overfill Horizontal
Adjustment Screw
Clip LP
Summary of Contents for X1130 Series
Page 16: ...16 Product Overview ...
Page 17: ...17 ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 42: ...42 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Page 53: ...53 This cord location is here First assy Blower module Second assy Mylar Ballast ...
Page 54: ...54 3 Blower wire alignment This clip must be screwed by this direction ...
Page 58: ...58 11 Lamp Door screw assemble sequence First Second Third ...
Page 62: ...62 Power Supply Problems Checking Flow ...
Page 63: ...63 ...
Page 76: ...76 ...
Page 77: ...77 Module 2 ASSY UPPER CASE ...
Page 78: ...78 Module 3 ASSY LOWER CASE ...
Page 79: ...79 Module 4 ASSY FRONT CASE ...