![Acer X1130 Series Service Manual Download Page 71](http://html.mh-extra.com/html/acer/x1130-series/x1130-series_service-manual_2839286071.webp)
71
2. Overfill adjustment
(Blue Edge adjustment)
1. “Full White Pattern” is suggested for this alignment.
2. Adjust 2 LP-alignment Screws (upper side / lower front side of Optical Engine) behind
Color Wheel.
3. Alignment Criteria is to adjust these 2 screws until “No Dark Edges” and “ No
Shadows” can be observed in image.
Summary of Contents for X1130 Series
Page 16: ...16 Product Overview ...
Page 17: ...17 ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 42: ...42 Fig 3 3 Fig 3 4 Fig 3 5 Fig 3 6 Datum1 Datum2 Datum3 Clip UP CM Sponge ...
Page 53: ...53 This cord location is here First assy Blower module Second assy Mylar Ballast ...
Page 54: ...54 3 Blower wire alignment This clip must be screwed by this direction ...
Page 58: ...58 11 Lamp Door screw assemble sequence First Second Third ...
Page 62: ...62 Power Supply Problems Checking Flow ...
Page 63: ...63 ...
Page 76: ...76 ...
Page 77: ...77 Module 2 ASSY UPPER CASE ...
Page 78: ...78 Module 3 ASSY LOWER CASE ...
Page 79: ...79 Module 4 ASSY FRONT CASE ...