![background image](http://html.mh-extra.com/html/acer/g310-altos/g310-altos_user-manual_6210052.webp)
4 Configuring the system
42
Opening the server
Caution!
Before you proceed, make sure that you have turned off
your system and all peripherals connected to it. Read the
“Preinstallation instructions” on page 41.
You need to open the server before you can install additional
components. The front and left side panels are removable to allow
access to the system’s internal components. Refer to the following
sections for instructions.
Before opening the server
Before opening the server, observe the following precautions:
1
Turn off the system and all the peripherals connected to it.
2
Unplug all cables from the power outlets.
3
Place the system unit on a flat, stable surface.
Note:
Because of the G310 design specification, only the side
panel needs to be removed to access the system board.
BB!H421!.!FO/cppl!!Qbhf!53!!Xfeoftebz-!Gfcsvbsz!29-!3115!!5;67!QN
Summary of Contents for G310 Altos
Page 1: ...Acer Altos G310 User s guide ...
Page 10: ...Contents x ...
Page 11: ...1 System information ...
Page 18: ...1 System information 8 ...
Page 19: ...2 System tour ...
Page 32: ...2 System tour 22 ...
Page 33: ...3 Getting Started ...
Page 34: ...This chapter gives information on setting up and starting to use your system ...
Page 46: ...3 Getting Started 36 ...
Page 47: ...4 Configuring the system ...
Page 90: ...4 Configuring the system 80 ...
Page 91: ...5 BIOS setup ...
Page 124: ...5 BIOS setup 114 ...
Page 125: ...Appendix A Management software installation ...
Page 126: ...This appendix shows you how to install the ASM and EasyBUILDTM software packages ...
Page 130: ...Appendix A Management software installation 120 ...