
25
Setting up the system
Preinstallation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
•
Near a grounded power outlet
•
Clean and dust-free
•
Stable surface free from vibration
•
Well-ventilated and away from sources of heat
•
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
•
Acer Altos G310 series system
•
Acer Altos G310 series User’s guide
•
Acer Altos G310 series Accessory box
•
System keys (attached to the rear panel of the system)
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
BB!H421!.!FO/cppl!!Qbhf!36!!Xfeoftebz-!Gfcsvbsz!29-!3115!!5;67!QN
Summary of Contents for G310 Altos
Page 1: ...Acer Altos G310 User s guide ...
Page 10: ...Contents x ...
Page 11: ...1 System information ...
Page 18: ...1 System information 8 ...
Page 19: ...2 System tour ...
Page 32: ...2 System tour 22 ...
Page 33: ...3 Getting Started ...
Page 34: ...This chapter gives information on setting up and starting to use your system ...
Page 46: ...3 Getting Started 36 ...
Page 47: ...4 Configuring the system ...
Page 90: ...4 Configuring the system 80 ...
Page 91: ...5 BIOS setup ...
Page 124: ...5 BIOS setup 114 ...
Page 125: ...Appendix A Management software installation ...
Page 126: ...This appendix shows you how to install the ASM and EasyBUILDTM software packages ...
Page 130: ...Appendix A Management software installation 120 ...