4 Configuring the system
40
Installation precautions
Before you install any server component, we recommend that you read
the following sections. These sections contain important ESD
precautions along with preinstallation and post-installation
instructions.
ESD precautions
Electrostatic discharge (ESD) can damage the processors, motherboard,
disk drives, expansion boards, or other components. Always observe
the following precautions before you install a server component:
1
Do not remove a component from its protective packaging until
you are ready to install it.
2
Wear a wrist grounding strap and attach it to a metal part of the
server before handling components. If a wrist strap is not
available, maintain contact with the server throughout any
procedure requiring ESD protection.
BB!H421!.!FO/cppl!!Qbhf!51!!Xfeoftebz-!Gfcsvbsz!29-!3115!!5;67!QN
Summary of Contents for G310 Altos
Page 1: ...Acer Altos G310 User s guide ...
Page 10: ...Contents x ...
Page 11: ...1 System information ...
Page 18: ...1 System information 8 ...
Page 19: ...2 System tour ...
Page 32: ...2 System tour 22 ...
Page 33: ...3 Getting Started ...
Page 34: ...This chapter gives information on setting up and starting to use your system ...
Page 46: ...3 Getting Started 36 ...
Page 47: ...4 Configuring the system ...
Page 90: ...4 Configuring the system 80 ...
Page 91: ...5 BIOS setup ...
Page 124: ...5 BIOS setup 114 ...
Page 125: ...Appendix A Management software installation ...
Page 126: ...This appendix shows you how to install the ASM and EasyBUILDTM software packages ...
Page 130: ...Appendix A Management software installation 120 ...