3 System upgrade
84
7
Insert the module into the fibre channel module connector. Make
sure that the card is properly seated
(C)
.
8
Rotate the retention latch downward.
9
Connect any required cable to the module.
10 Observe the post-installation instructions described on page 38.
ARMC/3 or BMC module
The ARMC/3 (optional) or BMC module provides server management
firmware and functionality for the system.
Removing the ARMC/3 or BMC module
1
Observe the ESD precautions and pre-installation instructions
described on page 37.
2
Remove the memory boards or memory air baffles from DIMM
slots C and D. See “Cold Removal of Memory Board” on page 75
and “Removing a memory board air baffle” on page 46.
3
Hold the module both by the loop finger grip and by the opposite
corner
(A)
.
Caution:
Do not bend or twist the module.
Summary of Contents for ALTOS R910 Series
Page 1: ...Acer Altos R910 Series User s Guide ...
Page 10: ...x ...
Page 11: ...1 System tour ...
Page 36: ...1 System tour 26 ...
Page 37: ...2 System setup ...
Page 45: ...3 System upgrade ...
Page 111: ...4 BIOS setup ...
Page 119: ...109 Error Manager Error Manager lets you view POST errors detected by the system ...
Page 137: ...127 Video The Video submenu allows you to enable or disable the onboard video controller ...
Page 150: ...4 BIOS setup 140 ...
Page 151: ...5 Troubleshooting ...
Page 164: ...5 Troubleshooting 154 ...
Page 165: ...Appendix A Acer Altos R910 rack installation guide ...
Page 166: ...This appendix shows you how to set up the Altos R910 server in a rack mount configuration ...
Page 178: ...Appendix A Acer Altos R910 rack installation guide 168 ...
Page 179: ...Appendix B Memory configuration options ...
Page 198: ...Appendix B Memory configuration options 188 ...
Page 199: ...Appendix C RAID configuration utilities ...
Page 206: ...Appendix C RAID configuration utilities 196 ...
Page 210: ...200 U upgrading the BIOS 139 ...