6
3.1
HEALTH
AND
SAFETY
OF
WORKERS
The
European
Community
has
adopted
a
number
of
directives
on
workplace’s
health
and
safety,
which
include
89/391/CEE
,
89/686/CEE,
89/655/CEE,
86/188/CEE
and
77/576/CEE
directives.
Every
employer
shall
implement
such
provisions
and
ensure
that
workers
respect
them:
Do
not
tamper
with
or
replace
parts
of
the
equipment
without
the
specific
consent
of
the
manufacturer.
The
manufacturer
shall
have
no
responsibility
whatsoever
in
case
of
unauthorised
operations.
Using
components,
expendable
materials
or
spare
parts
that
do
not
correspond
to
those
recommended
by
the
manufacturer
and/or
listed
in
this
manual
may
be
dangerous
for
the
operators
and/or
damage
the
equipment
The
operator’s
workplace
has
to
be
kept
clean,
tidy
and
free
from
objects
that
may
prevent
free
movements.
Appropriate
lighting
of
the
work
place
shall
be
provided
so
as
to
allow
the
operator
to
carry
out
the
required
operations
safely.
Poor
or
too
strong
lighting
can
cause
risks.
Ensure
that
work
places
are
always
adequately
ventilated
and
that
aspirators
are
working,
in
good
condition
and
in
compliance
with
the
requirements
of
the
laws
in
force.
3.2
PERSONAL
PROTECTION
EQUIPMENTS
Protective
clothing:
Maintenance
men
and
operators
has
to
wear
protective
clothing
that
complies
with
the
basic
safety
requirements
currently
in
force.
In
case
of
slippery
floors,
users
have
to
wear
safety
shoes
with
non
‐
slip
soles.
Gloves:
During
maintenance
or
cleaning
operation
protection
gloves
have
to
be
used
Mask
and
goggles:
Respiratory
protection
(mask)
and
eye
protection
(goggles)
should
be
used
during
cleaning
and
maintenance
operations.
3.3
SAFETY
SYMBOLS
The
equipment
features
the
following
safety
signs,
which
has
to
be
complied
with:
General
hazard
Electric
shock
hazard
When
operating
and
maintaining
the
PACK DUE
units,
use
the
following
personal
protective
equipments.
Summary of Contents for PACK DUE 12
Page 1: ......
Page 39: ...38 22 2 OUTDOOR UNITS 22 2 1 Wiring diagram of PACK DUE 9...
Page 40: ...39 22 2 2 Wiring diagram of PACK DUE 12...
Page 41: ...40 22 2 3 Wiring diagram of PACK DUE 16...
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......