32
1
Z E N ITH Z T S ( D) T-S E R I E S 16 0 0 -3 0 0 0 A & Z T S C T T-S E R I E S 10 0 -3 0 0 0 A
SOURCE 1 priority (SOURCE 2 = generator)
Switch position I
Switch position II
SOURCE 1 OK
SOURCE 2 OK
Activate test on load
Cancel test on load
Generator started
Generator stopped
Elevator/pre-transfer signal
Elevator/post-transfer signal
Pre-transfer S1 to S2 delay
Post-transfer S1 to S2 delay
Pre-transfer S2 to S1 delay
Post-transfer S2 to S1 delay
Check source synchronization
S1 availability delay
S2 availability delay
Engine warm up delay
Engine cooldown delay
—
Table 2.6 Closed Transition Switching Sequences, SOURCE 1 Priority (SOURCE 2 = Generator)
Summary of Contents for Zenith ZTS T Series
Page 2: ...2 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 6: ...6 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 10: ...10 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 36: ...36 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 44: ...44 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 106: ...106 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 108: ...108 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 122: ...2 122 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 126: ...2 126 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 129: ...129 1 OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...